top of page



Scallywag build progress
After only two weeks from the start of the buld , our Scallywag prototype is now onto its pre cut plywood strongback; the centercase, all frames, cockpit seat sides, stem and transoms are up and firmly epoxied in place. Next step is stringers and planking.
L.B.
Sep 251 min read


First Scallywag build!
The Scallywag prototype from our first kit of the type is under build in our workshop! The kit provides all plywood components to build the hull pre-cut to their definitive geometry. For example frames are supplied wherever possible as one piece, or in split components with puzzle joints. Doublers are also pre-cut with CNC drilled dowel pin holes to aid assembly.
L.B.
Sep 71 min read


Pathfinder bare hull delivered
After a 6 weeks build process Newyd Marine has delivered a Pathfinder bare hull to its new customer. The boat is entirely assembled, including mahogany plywood transom and seat tops. The bottom is glass sheeted and features a mahogany plywood skeg. The centerboard, rudder are assembled, shaped and glass sheated, solid mahogany tiller and bowsprit shaped and supplied. The boat is ready for painting and rigging by its new owner!
L.B.
Aug 141 min read


Pathfinder build progress 1
Planking complete!
L.B.
May 181 min read
bottom of page